The project consists of the demolition of approximately 10,000 square feet of existing garage and office facilities at the project site (Yard). In addition, approximately 35,630 square feet of the existing asphalt surface will be removed, re-graded and re-surfaced for the new development. A new building of approximately 8,500 square feet will replace the existing structures and consolidate the facility needs (office space, locker rooms, restrooms, storages and common areas) at the Yard. The new site layout will maximize the operational space inside the Yard and feature a more efficient parking layout and vehicular circulation appropriate for the larger trucks that dispatch from this location. This site is about 45630 square feet. The project will be the second of five yards to receive these improvements. The project scope also includes carport structures over some of the parking spaces, photo-voltaic panels over the building’s roof and carports, bio-swale areas, outdoor lighting and irrigation.